Service – Service Entrances

200Amp – Residential or Commercial

Free Standing

  • 200Amp Service
  • Built in accordance with PUD Specifications
  • Suitable for feeding a house or shop
  • Suitable for temporary power on the structure

400Amp – Residential or Commercial

Building Mounted

  • 400Amp Service
  • Wall Mounted on Strut
  • (2) 200Amp Disconnects feeding individual 200Amp Panels

Free Standing

  • 400Amp Service
  • Mounted on Steel in accordance with PUD Specifications
  • One 200Amp Disconnect to the left for the future residence
  • One 200Amp Panel to the right for the shop power and temporary power.

Group Meters and Meter Packs

Group Metering – New or Replace

  • Modern Group Metering engineered to fit your existing application.
  • Replace old Zinsco or otherwise worn out group meters.
  • Before: Rotten conduit; exposed sub panel feeders; Zinsco with burned bus work. Not Functioning well and not safe.

Before

After

Other

From Old to New

  • Found an old temporary power pole being used to power a barn for years.
  • New feeders from the PUD Pull box and mounted new Service on the Barn.
  • All is now safe and functional with appropriate distribution.

Before

After

100amp – Zinsco – Banjo

  • Entire Service needed replaced, especially the Zinsco panel.
  • 100amp Banjo Meter – Often times burnt wiring is found inside of them. Feeder wires do not support 200amp service needs.
  • New Mast in accordance with NEC and WAC. Service is now capable of 200amp upper bounds.

Before

After